Paradela Dam Repair
DOI:
https://doi.org/10.14195/2184-8394_45_7Abstract
Paradela rockfill concrete face dam, 110 m high, has been built between 1956 and 1958.
Both a short description of the dam and the history of its main repairs since 1962 are made. The last repair in 1980 with a waterproofing "in situ" membrane is justified and analysed. The amount of leakage through concrete slabs before and after 1980 is also compared.
Downloads
Download data is not yet available.