Monitoring of a tunnel of the Lisbon Metro network

Authors

  • Rui Correia LNEC
  • Joaquim Barreto Metropolitano de Lisboa

DOI:

https://doi.org/10.14195/2184-8394_51_3

Abstract

The paper deals with the instrumentation and monitoring of a subway tunnel in Lisbon.

Reference is made to the main characteristics of the tunnel, including thc geological and geotechnical conditions. The instrumentation arrangements are described and the main results of the measurements are presented and discussed.

The results of a numerical modelling of the construction of the tunnel at one of the five instrumented sections are also presented and compared with the measurements.

Downloads

Download data is not yet available.

Published

1987-10-20

Issue

Section

Articles