Lisbon's underground construction

Authors

  • J. S. Farinha Metropolitano de Lisboa

DOI:

https://doi.org/10.14195/2184-8394_16_3

Abstract

 Enlargement project of the present network (12 to 27 km). Crossed soils types on 1st phase of the works and galleries and constructed stations types. Correspondent construction phases and cost of works, referring to the 1st of July, 1973.

Downloads

Download data is not yet available.

Published

1976-02-20

Issue

Section

Articles